Bloom Township Zoning Department · Fairfield County, Ohio
Application checklist
No packet can be accepted with items missing.
All applications must be signed by the property owner (not the builder). The only exception is if the applicant has power of attorney. Fill in your details on screen, then print and sign in ink — signatures must be original, not faxed, copied, or electronic. Make checks payable to Bloom Township.
Setback requirements for a new residence
Twenty-five (25) feet from each side. Fifty (50) feet from the edge of the road right of way (front). Fifty (50) feet from the rear.
Application for New Residential Permit
Per Bloom Township Zoning Resolution 412–414, all permits are conditioned upon commencement of work within one year of filing. If work is not completed within 2 years of issuance, the permit shall expire.
Examples to follow: the original packet PDF includes example documents — a valid “to scale” site plan, and example well/septic and county address-letter documents. View them in the original PDF packet.